iBathrooms renovated Elaine’s bathroom in September 2022 and the whole project took 3 weeks to complete.
The bathroom renovation project consisted of removing the old drop-in tub with a tiled tub deck, removing tiled flooring, and removing the old closet and old vanity. It was practically a full gut job.
Our customer wanted to have a walk-in shower with the same large-scale tiles on the floor, walls and shower floor.
Using the Schluter family of products we’ve created a barrier-free shower with practical features such as grab bars, comfort high vanity and easy access to the shower.