How Long Does a Bathroom Remodel Take? Timeline & Tips

How Long Does a Bathroom Remodel Take? Timeline, Tips, and What to Expect…

Depending on the size of your bathroom and scope of the renovations, at iBathrooms the duration of a bathroom remodeling is typically anywhere from 1 to 3 weeks. In this article, we’ll discuss the standard timeline of each renovation phase, the factors that affect the duration, possible causes of schedule delays, and tips for a timely bathroom remodel.

What Affects Bathroom Remodel Duration? Key Factors to Know

There are a variety of factors that can affect a bathroom renovation timeline. These factors include:

How Long Does it Take to Remodel a Bathroom?

A typical bathroom remodel takes 1 to 3 weeks to complete. The exact duration depends on the bathroom size, project scope, material availability, and any unexpected issues that may arise during the renovation process.

Typical Timeline for Bathroom Renovation

Knowing how much time is needed to renovate a bathroom can help you plan and manage your expectations for the future. Below is a breakdown of the average timeline for each phase of a bathroom renovation:

  • Planning and Design — This phase is the longest and can take up to 1-2 weeks. It includes the initial consultation, creating the design, selecting materials, and signing the construction contract, along with getting any necessary permits approved.
  • Demolition — The demolition phase is usually quite fast, taking only 1-2 days, but can be longer due to your bathroom’s condition and any structural issues that may need to be dealt with.
  • Plumbing and Electrical Work — Updating plumbing and electrical lines or installing new ones tends to take 2-4 days and is critical to pave the way for the rest of the remodel. Within this phase, we make sure that everything meets building code requirements.
  • Drywall and Framing — Completing any needed framing, installing new drywall, and then preparing it for painting and tiling takes 2-3 days. However, the time it takes for the joint compound to dry can affect the overall timeline of the project.
  • Flooring and Tiling — The next phase of flooring and tiling takes 3-5 days in which we carefully install the flooring with a long-lasting and visually appealing finish, no matter the type of material you have chosen.
  • Installing Fittings and Fixtures — After the new flooring is done, new fixtures like the shower, toilet, and vanity, as well as any lighting, are installed which should take 2-3 days.
  • Painting and Touch Ups — In the final phase taking 1-2 days, the walls are painted, trims are installed, and any remaining tasks completed. Afterwards, a final inspection takes place to guarantee that your new bathroom is ready to be used.

What Causes Bathroom Renovation Schedule Delays?

It is important to be prepared for any potential delays to your renovation schedule and understanding what could cause delays can help reduce frustration if one of these challenges occurs:

  • Unforeseen Challenges — This is one of the most common and significant ways your renovations could be delayed. For example, during the construction phase, water damage could be found which would require more time for repairs.
  • Waiting for Inspections and Permits — Based on your local municipality, getting your permits could take longer than expected. As well, scheduling inspections could create delays based on when the inspector is available and if you need an inspection after each phase of the renovation.
  • Delivery Delays — Whether or not the materials you have chosen are available and how long it will take for them to be delivered is also a significant factor that could cause delays if they do not turn up when they are supposed to.
  • Scope or Design Changes — Changes made to the design after signing the contract is another way that your renovation schedule could be delayed. Adding new features or relocating fixtures when renovations have already started will undoubtedly lengthen the timeline as these changes need more planning, labour, and materials.

Tips to Keep Your Bathroom Remodel on Schedule

There are many steps you can take to ensure that your bathroom renovations stay on track and are even completed faster. Here are some tips to speed up the remodeling process:

Ready to Remodel Your Bathroom?

Throughout this article, we’ve discussed the particulars of how long a bathroom renovation takes, what could affect the duration of a remodel, factors that cause delays, and tips for keeping a remodel on schedule. At iBathrooms, we’re committed to providing you with high quality bathroom renovations.

To learn more or schedule a free consultation, contact iBathrooms at 613-725-7409 or visit www.ibathrooms.ca.

Free Online Quote

How to Get Started Bathroom Remodeling

1

Submit Your Details

To begin, we will ask you to complete the form and indicate your vision for your bathroom renovations in Ottawa, along with other project particulars. One thing you never have to worry about with our bathroom renovation company is your information being shared with a third party. The details you share with us are confidential and will only be used to learn more about your project goals.

2

Receive Confirmation

After submitting your details, you will receive an email from bathroom renovator confirming your submission. Then, we will begin reviewing the information you provided. If we have any questions, we will send them within the first 24-48 hours. Responding to us quickly will help us progress to the next phase promptly.

3

Get Your Virtual Quote

Once we have reviewed your information, we will provide a detailed quote based on the pictures and other details you provided. The quote will include a breakdown of the scope of work involved so you have a clear understanding of your bathroom renovation project. If you decide to proceed, we will schedule an in-home visit to assess your bathroom.

    Up to 10 pictures (*.JPG) / 6 MB each

    Free Online Quote

    iBathrooms © 2025 | Privacy Policy | Sitemap

    Free Online Quote